Pumps By Design Inc. — FORM PBD-CR-400

STARTUP & COMMISSIONING REQUEST

Please allow 2 weeks for scheduling after receipt of the completed form

1. PROJECT & SITE INFORMATION

If multiple stations require commissioning, submit a separate request for each station.

2. REQUIREMENTS — READ BEFORE SCHEDULING

  • We recommend the site electrician and 2 laborers be on-site and available to assist throughout the duration of the startup and commissioning.
  • A water source is required to test the station during startup. Water must be provided by a 2" or larger hose. A residential garden hose is not recommended.
  • Wet well and piping must be clean and free of debris.
  • Electrical cables must be pulled to the station control panel.
  • Station must not be exposed to sewage prior to commissioning. Contractor will be held responsible to handle any equipment which has been in contact with sewage.
  • Station training should take place immediately following completion of commissioning.
  • Contractor will be responsible for all additional costs required for return visits due to incomplete construction, unavailable or absent crew members, repeated testing, and owner training.

3. SITE READINESS QUESTIONS

1. Will a lifting device to remove pumps be available during commissioning?
2. Has permanent power been provided to the control panel?
3. Has electrical conduit been sealed?
6. Is a junction box used?

4. DESIGN POWER

Line voltage and phase verified?

5. SITE PICTURES — REQUIRED BEFORE SCHEDULING

Site pictures must be received by Pumps By Design Inc. prior to scheduling. Upload photos below — they are saved securely with your submission. Check off what your photos include:

Upload site photos — saved securely with your submission*

JPG, PNG, WEBP — multiple photos supported

Attach files — drawings, reports, manuals, or other documents

PDF, DWG, XLSX, DOCX, images — multiple files supported

6. ON-SITE FIELD SURVEY

ON-SITE FIELD SURVEY

Complete this section while on-site. Rate each area, note anything the commissioning crew should know before arrival, and attach photos directly from your phone.

Wet Well / Basin

Pumps & Guide Rails

Valve Vault & Piping

Control Panel & Wiring

Access Hatch & Grade

Site Access & Staging

Capture site conditions on your phone — photos upload instantly

JPG, PNG, WEBP — multiple photos supported

7. REQUESTER INFORMATION & SIGNATURE

Your request and all photos will be saved and sent to support@pumpsbydesign.com. Please allow 2 weeks for scheduling.